Road Information

Interstate 475 in Georgia    
Total Mileage in State: 15 miles
Northern End: At I-75, near Bolingbroke
Southern End: At I-75, near Macon
Mileage covered in Photos: 15 miles
Counties covered in Photos: Monroe, Bibb
Major Junctions in Photos: US 41, in Bolingbroke
I-75 South, near Macon
Control Cities in Photos: Bolingbroke, Macon

Southbound

   

Merging onto Interstate 475 South from Interstate 75 South via Exit 177. (Photo taken 5/21/17).

Interstate 475 South at Exit 15: US 41 - Bolingbroke (Photo taken 5/21/17).

View on Interstate 475 South at mile marker 14. (Photo taken 5/21/17).

Mileage sign on Interstate 475 South. It's 35 miles to Perry and 156 miles to Valdosta. (Photo taken 5/21/17).

This overhead sign warns that trucks over 6 wheels must use the right two lanes only. (Photo taken 5/21/17).

The minimum speed limit on Interstate 475 South is 40 mph, which is standard on most Interstate highways in Georgia. (Photo taken 5/21/17).

Interstate 475 South at mile marker 12. (Photo taken 5/21/17).

Interstate 475 South as it enters Bibb County. (Photo taken 5/21/17).

The maximum speed limit on Interstate 475 South is 70 mph. This is the standard maximum speed limit on most rural Interstate highways in Georgia. (Photo taken 5/21/17).

Take any of the next 3 exits to Macon. (Photo taken 5/21/17).

Interstate 475 South at Exit 9: Zebulon Road (Photo taken 5/21/17).

View on Interstate 475 South at mile marker 7. (Photo taken 5/21/17).

Interstate 475 South at Exit 5: GA 74 - Macon / Thomaston (Photo taken 5/21/17).

Take Exit 3 to Middle Georgia State University, Central Georgia Tech College, and the State Farmers Market. (Photo taken 5/21/17).

Interstate 475 South at Exit 3: US 80 / GA 22 - Macon / Roberta (Photo taken 5/21/17).

The maximum speed limit remains 70 mph. (Photo taken 5/21/17).

Interstate 475 South as it enters the Macon city limits. (Photo taken 5/21/17).

Interstate 475 South at mile marker 2. (Photo taken 5/21/17).

View on Interstate 475 South at mile marker 1. (Photo taken 5/21/17).

Interstate 475 South at mile marker 0, posted a bit prematurely. (Photo taken 5/21/17).

Interstate 475 South at Exit 1: Hartley Bridge Road (Photo taken 5/21/17).

Beyond Exit 1, the three southbound lanes of Interstate 475 become the ramp to Interstate 75 South as I-475 approaches its southern terminus. (Photo taken 5/21/17).

State-named Interstate 475 END shield as I-475's three southbound lanes prepare to merge into the southbound lanes of Interstate 75. (Photo taken 5/21/17).

Interstate 475 South at its southern terminus, as it merges into Interstate 75 South. (Photo taken 5/21/17).